Support / FAQ
This is a collection of FAQs, which are of interest for clients of the IO-Link Master Tester.
Q: Loading of several IODD's by the device configurator dialog fails
with error message e.g. 'Missing ProcessDataIn element in document'.
A: The version V1.0 of IO-Link Master Tester expects some optional XML entries
as mandatory. This issue will be corrected in Version 1.1.
As work arround you can add the missing XML entry in the IODD e.g. :
<ProcessDataIn id="dummy" bitLength="0" />
Q: Trigger pulse at BNC to short.
A: It is not possible to set a Trigger pulse with 24VDC
Q: A IO-Link Master with PROFIBUS interfaces is not able to establish
a communication with the Master Tester System, using the default DUT_IF DLL (Hilscher).
A: The DUT_IF DLL V1.0.0 has a timeout of 10s for startup. If a DUT needs longer for startup,
the connection fails.
It is possible to change the source code of the DUT_IF DLL and build a new version
(Source package is delivered on the Product CD). Please contact MESCO for support.
The DUT_IF DLL V1.1.0 has an extendet timeout implemented.
Q: At Win 7 the USB driver will not be automaticly installed with the setup.exe
A: If the Hardware Wizard does not find the preinstalled Golden Device Driver,
you can select it manualy in the installation directory.

